00:0000:00
00:0000:00

At the JW Marriott Maldives, we grew 30 meters of new beach in six months. Fifty-four seabed structures, arranged to guide the ocean's own sand back to shore. No dredging, no pumps, no imported fill. The reef that rebuilt the beach became a dive site along the way.

ENGINEERING BY

COASTAL ASSEMBLY PBC

CEO

Skylar Tibbits

Director Of TECHNOLOGY

Walter Zesk

DIRECTOR OF OPERATIONS

Sarah Doyle