At the JW Marriott Maldives, we grew 30 meters of new beach in six months. Fifty-four seabed structures, arranged to guide the ocean's own sand back to shore. No dredging, no pumps, no imported fill. The reef that rebuilt the beach became a dive site along the way.
ENGINEERING BY
COASTAL ASSEMBLY PBC
CEO
Skylar Tibbits
Director Of TECHNOLOGY
Walter Zesk
DIRECTOR OF OPERATIONS
Sarah Doyle



