At the Taj Exotica Maldives, we accumulated over 800 cubic meters of sand with a single ring of six structures. Placed to work with the currents in both monsoon seasons, it keeps building year-round. Not for one season, but continuously, as the ocean moves sand back where it's needed.
ENGINEERING BY
COASTAL ASSEMBLY PBC
CEO
Skylar Tibbits
Director Of TECHNOLOGY
Walter Zesk
DIRECTOR OF OPERATIONS
Sarah Doyle



